HXOES

HUAXICUN OFFSHORE ENGINEERING

  • HOME

  • ABOUT US

    • Company Profile

    • Qualification

    • Culture

    • Equipment

    • History

  • SERVICE

    • Offshore oil and gas engineering

    • Offshore wind power engineering

    • Port and dock construction projects

    • Cable laying and maintenance engineering

  • RESOURCES

    • Huaxi 5000

    • Huaxi 1600

    • Huaxi 900

    • CMT1

    • Huaxi 1

    • CMT2

    • Huatuo

    • Huana

    • SUN1

    • Huahai barge

    • Huawu

    • CMT301/CMT302

  • PERFORMANCE

    • Offshore oil and gas engineering

    • Offshore wind power project

    • Submarine cable and submarine pipeline laying

  • NEWS

    • Entreprise's news

    • Industry Information

    • FAQ

  • CONTACT US

  • LANGUAGE

    • 中文

    • English

NEWS

  • Home page

Entreprise's News

Industry Information

FAQ

Submarine cable + land cable "relay race", building a smooth "track" - Huaxi Ocean Engineering helps Guo Hua HG14 project's first loop successfully grid-connected

Submarine cable + land cable "relay race", building a smooth "track" - Huaxi Ocean Engineering helps Guo Hua HG14 project's first loop successfully grid-connected

On November 13, 2024, the first circuit of the Guohua HG14 offshore photovoltaic project, in which Huaxi Marine Engineering participated, was successfully connected to the grid, marking the successful grid connection of China's first million-kilowatt-level offshore photovoltaic project.

11-15

2024

Submarine cable + land cable "relay race", building a smooth "track" - Huaxi Ocean Engineering helps Guo Hua HG14 project's first loop successfully grid-connected
Submarine cable + land cable "relay race", building a smooth "track" - Huaxi Ocean Engineering helps Guo Hua HG14 project's first loop successfully grid-connected
Warm congratulations on the smooth delivery of the "West China 1600" self elevating offshore wind power installation platform

Warm congratulations on the smooth delivery of the "West China 1600" self elevating offshore wind power installation platform

The latest generation of self elevating offshore wind power installation platform in China, "Huaxi 1600" 1600 ton self elevating offshore wind power installation platform, invested and constructed by Huaxi Offshore Engineering, was successfully delivered in Qingdao. Various participating parties, business cooperation units, and multiple news media units participated in the delivery ceremony.

11-22

2023

Warm congratulations on the smooth delivery of the "West China 1600" self elevating offshore wind power installation platform
Warm congratulations on the smooth delivery of the "West China 1600" self elevating offshore wind power installation platform
Huaxi 5000 successfully completed the lifting operation of the upper module of the booster station in the Lemen and Zhangpu projects

Huaxi 5000 successfully completed the lifting operation of the upper module of the booster station in the Lemen and Zhangpu projects

Warmly congratulate "Huaxi 5000" on successfully completing the lifting operation of the upper module of the Huaneng Lemen Erhai Booster Station and the Zhangpu Liu'ao Offshore Wind Power Phase II Booster Station last week.

08-31

2023

Huaxi 5000 successfully completed the lifting operation of the upper module of the booster station in the Lemen and Zhangpu projects
Huaxi 5000 successfully completed the lifting operation of the upper module of the booster station in the Lemen and Zhangpu projects
Only Realistic Encouragement, New Courage, Struggle, and Sail: A New Chapter in the Book of Sailing - West China Offshore Engineering Holding the 2023 Half Year Summary Meeting

Only Realistic Encouragement, New Courage, Struggle, and Sail: A New Chapter in the Book of Sailing - West China Offshore Engineering Holding the 2023 Half Year Summary Meeting

Recently, Huaxi Offshore held a semi annual work summary meeting for 2023. The meeting comprehensively summarized and reviewed the work in the first half of the year, systematically analyzed the current situation, and made key deployments for the work in the second half of the year, providing strong guidance for promoting the effectiveness of various work throughout the year. Chairman Gao Ming presided over the meeting, with the participation of the company's leadership and department heads.

08-10

2023

Only Realistic Encouragement, New Courage, Struggle, and Sail: A New Chapter in the Book of Sailing - West China Offshore Engineering Holding the 2023 Half Year Summary Meeting
Only Realistic Encouragement, New Courage, Struggle, and Sail: A New Chapter in the Book of Sailing - West China Offshore Engineering Holding the 2023 Half Year Summary Meeting
Good News | Jishui Ceremony of West China 1600 Wind Power Installation Platform Successfully Held at Shanghai Shipyard

Good News | Jishui Ceremony of West China 1600 Wind Power Installation Platform Successfully Held at Shanghai Shipyard

On the morning of June 19th, the Jishui Ceremony of Huaxi Offshore 1600T Self elevating Wind Power Installation Platform (hereinafter referred to as "Huaxi 1600") was successfully held at Shanghai Shipyard.

06-25

2023

Good News | Jishui Ceremony of West China 1600 Wind Power Installation Platform Successfully Held at Shanghai Shipyard
Good News | Jishui Ceremony of West China 1600 Wind Power Installation Platform Successfully Held at Shanghai Shipyard
Huaxi Marine Engineering officially launched the 2023 "Safety Production Month" activity

Huaxi Marine Engineering officially launched the 2023 "Safety Production Month" activity

June this year is the 22nd national "Safety Production Month", the theme is "Everyone is safe, everyone will be emergency". On May 31, the West China Marine Industry Organization held a "Safety production Month" theme activity mobilization meeting, and officially launched a series of "safety production Month" activities to effectively promote the awareness of safety red line and promote the implementation of safety production responsibility.

06-08

2023

Huaxi Marine Engineering officially launched the 2023 "Safety Production Month" activity
Huaxi Marine Engineering officially launched the 2023 "Safety Production Month" activity
< 12345 >
  • HOME

  • ABOUT US

    • Company Profile

    • Qualification

    • Culture

    • Equipment

    • History

  • SERVICE

    • Offshore oil and gas engineering

    • Offshore wind power engineering

    • Port and dock construction projects

    • Cable laying and maintenance engineering

  • RESOURCES

    • Huaxi 5000

    • Huaxi 1600

    • Huaxi 900

    • CMT1

    • Huaxi 1

    • CMT2

    • Huatuo

    • Huana

    • SUN1

    • Huahai barge

    • Huawu

    • CMT301/CMT302

  • PERFORMANCE

    • Offshore oil and gas engineering

    • Offshore wind power project

    • Submarine cable and submarine pipeline laying

  • NEWS

    • Entreprise's news

    • Industry Information

    • FAQ

  • CONTACT US

Service Hotline

+86-510-68522288

Fax: +86-510-68522378

E-mail: hxoes@hxoes.com

Add: No.1 Minzu Road, Huaxi Village, Jiangyin City, Jiangsu Province, China

Website: http://www.hxoes.com

Copyright © 2023 Jiangsu Huaxi Village Ocean Engineering Service Co., Ltd.

www.300.cn | Tag  |  Business license