Rear Trench Excavation Project for Mamu Zhenhai Offshore Section
From March to April 2020, the "Huaxi 1" fleet of Huaxi Offshore Engineering completed the post excavation ditch project of the 12.45-kilometer Mamu Zhenhai offshore section, with a construction depth of 20 meters and a ditch depth of 3 meters.

Keyword: Rear Trench Excavation Project for Mamu Zhenhai Offshore Section