BZ28-34 Oilfield Group Regional Development Project Block and Living Building Project


From March 4th to March 24th, 2015, Huaxi 5000 successfully lifted three modules: BZ34-1 WHPE module (2900 tons), BZ34-2/4 WHPB module (2720 tons), and BZ34-1 WHPF module (3100 tons) into position in the development project of the Bozhong 28-34 oilfield group. The quality qualification rate reached 100%, and the lifting task delivered by the owner was successfully completed. After careful cooperation, with a high sense of protagonist responsibility, meticulous work attitude, and rigorous work style, the entire ship team strictly followed the operating procedures and cautiously operated under the leadership of the director, implementing the principle of "safety first, prevention first". For 494 consecutive hours of safety production, there were no accidents, which was fully recognized by the owner and a letter of praise was sent.
The BZ28-34-2/4 CEPA living building block is a dual well mouth comprehensive production platform with 8 legs and 12 piles. After the merger of the CEPA block and the living building, the total weight is 15700 tons, making it the largest and heaviest oil production platform in Bohai Sea. On May 22, 2015 at 17:00, after careful deployment and construction by Huaxi 5000, the CEPA living building blocks were installed in place.


Previous Page

Next Page

Previous Page

Next Page