Kenli 3-2 Jacket Project


The WHPA jacket construction operation of Kenli 3-2 project has a water depth of about 18 meters in the sea area, and the jacket weighs about 1925 tons. It has an 8-leg pile structure, with two 96 "diameter steel piles each measuring 74m/58.3m in length and weighing about 198T/213T. On August 22, 2013, after careful organization by the project team and careful construction by the Huaxi 5000 vessel, the positioning error of the jacket was 0.3 meters and the azimuth error was 0.1 degrees, fully meeting the strict requirements of the owner's position error of 0.5 meters and azimuth error of 2.5 degrees.