Jinzhou JZ25-1S Phase II Module Installation Project


Jinzhou JZ25-1S Phase II WHPD module includes all assembly operations of the east-west module (lifting weight: 5820T), living building (lifting weight: 960T), drilling and repair machine (DSM module, DES module lifting weight: 2300T), trestle (lifting weight: 25T), torch arm (lifting weight: 150T), as well as drilling and repair machine mast, crown block section, platform crane, crane boom, etc. The total lifting weight is close to ten thousand tons.
The JZ25-1S Phase II WHPC module includes the east-west module (lifting weight: 6270T), the living building (lifting weight: 950T), the drilling and repair machine (DSM module, DES module lifting weight: 2060T), the torch arm (lifting weight: 80T), as well as all assembly operations such as the drilling and repair machine mast, crown block section, platform crane, and crane boom, with a total lifting weight of over 10000 tons.
From June to July 2015, the "Huaxi 5000" fleet was meticulously deployed and continuously fought, successfully completing the installation project of the JZ25-1S Phase II WHPD module and WHPC module, fully demonstrating the combat effectiveness, cohesion, and brave spirit of the "Huaxi 5000" team, and also receiving high praise and trust from the owners.


Previous Page

Next Page

Previous Page

Next Page