Penglai 19-3 Block Drilling Machine Living Building Installation Project


Our company has undertaken the WHPG jacket platform module drilling rig living building installation project for the comprehensive adjustment project of Zone 1389 of CNOOC Penglai 19-3 Oilfield. It is a newly built 8-leg wellhead platform WHPG wellhead platform with 40 well slots, a surrounding dual well, 62 wells, and 315 module drilling rig with self power supply. A living building for 100 people. The project's east-west components, drilling rig (DES/DSM), living building, two sets of ash tanks, derrick base, and crown block section were successfully lifted by our company's crane vessel "Huaxi 5000" on the oil field site in August 2018.
The weight of the western module of this project is 2996T, the eastern module is 3090T, the living building is 1170T, the drilling platform DES is 1020T, and the drilling platform DSM is 1133T. Most large lifting items need to be lifted in place at night, which is difficult to construct. After 12 days of hard work, Huaxi 5000 has closely cooperated with CNOOC Installation Company and communicated with the PL19-3 owner and engineering project team in a timely manner, adhering to the principle of "safety first and prevention first", The new and old employees of the entire ship worked together to overcome the numerous difficulties in on-site operations, and completed the installation and placement of other loose parts in the WHPG jacket platform, drilling rig, living building, with high quality, efficiency, comprehensiveness, and safety, which was unanimously recognized by the on-site owner and platform. The completion of this project adds a significant touch to the performance of Huaxi 5000 in offshore oil engineering.


Previous Page

Next Page

Previous Page

Next Page