Zhangpu Liu'ao Offshore Wind Power Phase II Project


Huaxi Offshore Engineering is responsible for the construction of the wind turbine foundation steel pipe pile sinking and lifting of the booster station for the 29 wind turbine units of the Zhangpu Liu'ao Offshore Wind Power Phase II Project. The booster station is the first offshore booster station outside of Minnan.
In August 2023, the "Huaxi 5000" fleet immediately transferred to the Zhangpu Liu'ao Offshore Wind Power Phase II Project for the lifting of the upper module of the booster station after completing the lifting task of the Lemen Second Sea Booster Station, with a lifting weight of approximately 3500 tons. The project team combined the existing ship machinery resources, sorted out the construction process and risk sources, and after repeated deduction, determined to implement the lifting frame structure operation on the basis of the "tail fastening" plan to ensure the ship is in place and the overall lifting installation is smooth.


Previous Page

Next Page

Previous Page

Next Page