Kenli 3-2 Oil Pipeline Landing Trenching Project


On December 14, 2013, Huaxi 900 successfully completed the sea trial of the trenching machine and carried out post trenching work for the KP32.850 section with a depth of 1.5 meters. The average depth of the trench was 2.7-2.8 meters, which met the technical requirements for post trenching in Kenli 3-2 oilfield at once and received praise from the owner. On December 16, "Huaxi 1" successfully completed the trench excavation of Kenli 3-2 project after 4 meters of burial depth, with an average depth of 5.2-5.3 meters. The burial depth was more than 4 meters after the survey, which met the technical requirements for trench excavation after 4 meters of burial depth, and was praised by the owner. On December 22nd, "Huaxi 1" was put into the trench excavation work of the Kenli 3-2 project at a depth of 1.5 meters. The average daily trench excavation speed within effective working days reached 1.8 kilometers, and the project was successfully completed on December 31st.

 


Previous Page

Next Page

Previous Page

Next Page