(Summary description)According to the two main hoisting methods of domestic offshore wind power installations, the company has formed a way to meet the challenges of the wind power market with split installation as the main and integral installation as a supplement. In the first phase, the company invested two jack-up platform ships as the main body of construction for the split installation, and the overall installation adopts Huaxi 5000 as the main body of construction. The split installation sequence is from bottom to top to install the bottom section, middle section, and upper section of the tower, hoist the nacelle hub complex, and then install the single blade. The normal construction efficiency is 3 days/unit.
Fan installation
(Summary description)According to the two main hoisting methods of domestic offshore wind power installations, the company has formed a way to meet the challenges of the wind power market with split installation as the main and integral installation as a supplement. In the first phase, the company invested two jack-up platform ships as the main body of construction for the split installation, and the overall installation adopts Huaxi 5000 as the main body of construction. The split installation sequence is from bottom to top to install the bottom section, middle section, and upper section of the tower, hoist the nacelle hub complex, and then install the single blade. The normal construction efficiency is 3 days/unit.
- Categories:Application field
- Author:
- Origin:
- Time of issue:2020-10-22
- Views:
According to the two main hoisting methods of domestic offshore wind power installations, the company has formed a way to meet the challenges of the wind power market with split installation as the main and integral installation as a supplement. In the first phase, the company invested two jack-up platform ships as the main body of construction for the split installation, and the overall installation adopts Huaxi 5000 as the main body of construction. The split installation sequence is from bottom to top to install the bottom section, middle section, and upper section of the tower, hoist the nacelle hub complex, and then install the single blade. The normal construction efficiency is 3 days/unit.
Scan the QR code to read on your phone

Tel: +86-510-68522288
Fax: +86-510-68522378
E-mail: hxoes@hxoes.com
Add: Tower 1, Huaxi Village, Jiangyin City, Jiangsu Province
Website: http://www.hxoes.com
Copyright © 2021 Jiangsu Huaxi Village Ocean Engineering Service Co., Ltd. 苏ICP备13016017号